On-Going Projects

Ongoing City Gas Pipeline Expansion & Distribution Network – Jharkhand
City Gas Distribution

City Gas Pipeline Expansion & Distribution Network – Jharkhand

The Jharkhand Gas Pipeline Project focused on extending city gas distribution infrastructure across selected districts, enabling a reliable network for PNG supply to households, commercial units, and small-scale industries. The project included MDPE pipeline laying, steel pipeline installation for higher-pressure segments, leak testing, meter installation, and final commissioning. By completing this project, we contributed to Jharkhand’s clean energy expansion roadmap, improving fuel accessibility and supporting long-term urban utility modernization.

71.6Cr
Ongoing Smart Meter Deployment – Uttar Pradesh State
Smart Meter Infrastructure

Smart Meter Deployment – Uttar Pradesh State

The Smart Meter Uttar Pradesh Project is a large-scale modernization initiative aimed at upgrading the state’s power distribution network through the installation of advanced prepaid and postpaid smart meters. This project enhances billing transparency, improves load management, reduces AT&C losses, and provides real-time energy usage insights for consumers and utilities. Our engagement covers complete implementation, including device installation, communication network setup, backend integration with utility systems, field operations, and ongoing support. The project supports Uttar Pradesh’s roadmap for digital transformation and smarter energy governance.

128Cr
Ongoing Smart Meter Deployment – Bihar State
Smart Meter Infrastructure

Smart Meter Deployment – Bihar State

The Smart Meter Bihar Project is an advanced state-wide infrastructure upgrade focused on modernizing electricity distribution through the deployment of intelligent prepaid and postpaid smart meters. This initiative enhances energy efficiency, reduces transmission losses, strengthens billing accuracy, and enables real-time monitoring for both consumers and utilities. Our scope of work includes end-to-end implementation: installation, networking, data integration, system configuration, and long-term operational support. The project aligns with the government's Digital India vision and aims to transform Bihar’s power consumption ecosystem.

104.9Cr

Upcoming Projects

Upcoming Underground Cable Infrastructure Project – Banaras
Underground Cabling System

Underground Cable Infrastructure Project – Banaras

The Banaras Underground Cable Infrastructure Project is a forward-looking urban modernization initiative focused on replacing overhead electrical lines with an integrated underground cabling system. This upgrade is designed to enhance power reliability, reduce outage frequency, improve safety, and support long-term smart city development. Our scope includes trenching, ducting, cable laying, jointing and termination, feeder pillar installation, network restructuring, and system testing. The project aims to strengthen Banaras’ core electrical infrastructure and create a cleaner, hazard-free urban environment aligned with upcoming smart city standards.

76.7Cr

Completed Projects

Completed LT, HT & DTR Reconditioning Project – Bihar
Electrical Distribution Network Upgradation

LT, HT & DTR Reconditioning Project – Bihar

The LT, HT, and DTR Reconditioning Project in Bihar involved comprehensive refurbishment and upgradation of the state’s distribution network to enhance power reliability, reduce technical losses, and extend asset lifespan. The scope of work included: – Reconditioning and oil filtration of Distribution Transformers (DTRs) – Replacement of damaged LT/HT conductors, insulators, and hardware – Structural strengthening of poles and cross-arms – Preventive maintenance, megger testing, and load balancing – Improving earthing systems and safety compliance – Full re-energization and performance testing after refurbishment This project significantly improved network stability, reduced outage frequency, and ensured safer, more efficient distribution for both rural and urban consumers across Bihar.

14.3Cr
Completed Power Sub-Station (PSS) Development Project- Bihar
Power Sub-Station Construction

Power Sub-Station (PSS) Development Project- Bihar

The Bihar PSS Project focused on the complete development of a modern Power Sub-Station designed to improve grid stability, enhance power distribution efficiency, and support regional load demand. The scope included civil foundation works, equipment installation (transformers, switchgear, control panels), cable laying, earthing systems, protection and relay setup, SCADA integration, and full commissioning. This project strengthens Bihar’s transmission and distribution infrastructure, ensuring reliable power supply to residential, commercial, and industrial consumers.

89.7Cr
Completed Solar Energy Deployment & Rooftop Power Generation Project – Bihar
Solar Power Infrastructure

Solar Energy Deployment & Rooftop Power Generation Project – Bihar

The Bihar Solar Project focuses on deploying clean and sustainable energy solutions through rooftop solar installations, ground-mounted solar arrays, and hybrid solar power systems across residential, commercial, and institutional locations. The project scope includes site assessment, structural evaluation, solar panel installation, inverter setup, DC/AC cable laying, net-metering integration, performance monitoring systems, and final commissioning. This initiative enhances renewable energy adoption in Bihar, reduces grid dependency, lowers operational costs for consumers, and supports the state’s long-term green energy roadmap under national renewable energy missions.

24.8Cr
Completed City Gas Distribution & Pipeline Network Project – Bihar
City Gas Distribution / PNG Pipeline Network

City Gas Distribution & Pipeline Network Project – Bihar

The Bihar Gas Pipeline Project involved the development and installation of a modern city gas distribution (CGD) network designed to deliver PNG (Piped Natural Gas) to residential, commercial, and small industrial consumers. The scope of work included MDPE and steel pipeline laying, underground trenching, jointing, valve installation, pressure regulation systems, and household connection integration. This initiative strengthens Bihar’s clean energy infrastructure and supports the state’s transition toward safer, efficient, and environmentally friendly fuel delivery systems.

38.3Cr
Completed Metro Piling & Foundation Works – Patna Metro Rail Project
Metro Rail Infrastructure

Metro Piling & Foundation Works – Patna Metro Rail Project

The Patna Metro Piling Project is a critical civil engineering initiative forming the structural foundation for the upcoming Patna Metro Rail corridors. The project involves executing deep piling works required for stations, viaducts, and elevated metro structures. Our scope includes soil investigation, borehole drilling, reinforced concrete piling, pile cap construction, load testing, and alignment-specific foundation engineering. These operations ensure long-term structural stability, vibration resistance, and load-bearing capacity for metro infrastructure. This project supports Patna’s transformation into a modern, high-capacity urban transit system and adheres to national metro construction standards and safety protocols.

102.7Cr
Completed Water Supply Pipeline Infrastructure Project – Uttar Pradesh
Water Supply & Distribution

Water Supply Pipeline Infrastructure Project – Uttar Pradesh

The Uttar Pradesh Water Supply Pipeline Project is a comprehensive infrastructure initiative focused on expanding and upgrading potable water distribution networks across key regions of the state. The project includes the construction and installation of large-diameter transmission mains, distribution pipelines, valve chambers, household connections, and network integration with existing water treatment facilities. This initiative supports the state's mission of delivering reliable, safe, and continuous drinking water to both rural and urban populations. Our scope of work covers pipeline laying, trenching, jointing, pressure testing, network optimization, and final commissioning. The project is aligned with the broader state-level objectives under Har Ghar Jal and urban water modernization programs.

63.9Cr
Completed Shitala Mata Hospital Construction Works – Sector 102, Gurgaon
Structural Construction & Civil Engineering Work

Shitala Mata Hospital Construction Works – Sector 102, Gurgaon

Execution of reinforcement steel (sariya) fabrication, shuttering, and concreting works for the Shitala Mata Hospital project located in Sector 102, Gurgaon. Scope includes high-precision structural work, adherence to engineering standards, quality assurance, and timely delivery as per client specifications.